BS EN 12350-1 PDF

Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll . This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Jujas Bar
Country: Colombia
Language: English (Spanish)
Genre: Finance
Published (Last): 2 August 2018
Pages: 304
PDF File Size: 8.75 Mb
ePub File Size: 19.88 Mb
ISBN: 344-5-27383-922-9
Downloads: 45067
Price: Free* [*Free Regsitration Required]
Uploader: Zurisar

While the spot sampling takes scoopfuls from the initial discharge of the concrete from the truck mixer.

Each sample shall be accompanied by a report from the person responsible for taking 123500-1 sample. Your Alert Profile lists the documents that will be monitored.

BS EN 12350-1:2009

Ej the mold in three layers of approximately equal height. Their committees work with the manufacturing and service industries, government, businesses and consumers to facilitate the production of British, European and International standards.

Scoopfuls are taken from four different parts of the load to form the standard sample. The mold is raised and the concrete allowed to subside. Create a website 12305-1 blog at WordPress.

BS EN – Testing fresh concrete. Sampling (British Standard)

The place else may anybody get that type of info in such a perfect means dn writing? Subject the concrete to a sufficient number of strokes per layer, typically Record the temperature to the nearest 0.

Leave the TMD in the concrete a minimum of 2 min. What is the frequency of Sampling of Concrete? Customers who bought this product also bought BS EN The Red document status indicator indicates that the document is an old version The document has likely been withdrawn by the publisher, also the meta data presented here may be out of date as it is no longer being maintained by the editorial teams at 12350.

Related Posts  SOUL NOURISHMENT FIRST BY GEORGE MULLER PDF

Proceed to Checkout Continue Shopping. Please first log in with a verified email before subscribing to alerts. For this to occur the delay should be sufficient for the lower layer to develop an initial set or harden. Depending on the consistency of the concrete and the method of compaction, moulds shall be filled in one or more layers to achieve full compaction.

What is the time limit before placing of fresh concrete?

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

Minimum size of sample x 1. Want access to British Standards? You may delete a document from your Alert Profile at any time. Free to use BIM project management tool provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of the asset life cycle in level 2 BIM projects.

Find Similar Items This product falls into the following categories. Apparatus Mold Mold use for slump test ns fresh concrete Dimension in mm Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller Length of at least mm In addition, a scoop is needed.

Related Posts  BHRIGU SAMHITA IN GUJARATI PDF

Take the be of concrete through the moving stream from the truck mixer.

This will cause the delay of pouring and worst the rejection of other concrete truck loads because of the temperature overdue. Gently press the concrete around the TMD at the surface of concrete so that the ambient temperature does not influence the reading. The elapsed time shall not exceed 15 min.

Concrete cubes at the site Marking The test specimens shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, specimen ID, location of sampling…. Click here to find out how to access this document. Significance and Use Provides standardized requirements for making, curing, protecting and transporting concrete specimens.

BS EN – Testing fresh concrete. Sampling – BSI British Standards

Protect the sample from the sun, wind, and other sources of rapid evaporation, and from contamination. This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot dn.

Apparatus Container, large enough to provide at least 75 mm of concrete in all directions around the sensor of the temperature measuring device, or at least three times the NMAS Nominal Maximum Aggregate Sizewhichever is greater. It may be used to verify conformance to a specified requirement for the temperature of concrete.